1. REPAIR KNOCKDOWN - Reset existing metal pole and truss arm or set a new metal pole and/or truss arm and new breakaway base. Ensure pole is straight (shim if necessary), Never Seizetm all anchor rod nuts and bolts, reset truss arm and re-install lighting fixture. Install new wiring and fuse kits and fuses as needed. Complete wiring and test. Affix pole numbers in accordance with County requirements. Dispose of all removed materials. 2. REPLACE BREAKAWAY BASE - Remove existing pole, replace breakaway base with in kind or other. Ensure pole is straight (shim if necessary), Never Seizetm all anchor rod nuts and bolts, reset truss arm and re-install lighting fixture. Install new wiring and fuse kits and fuses as needed. Complete wiring and test. Dispose of all removed materials. 3. REMOVE CONCRETE FOUNDATION - Remove foundation from ground, install all conduits and wiring to keep circuit operational when needed. Provide protection of work site if left open. Dispose of all removed materials, restore surface to original condition...