0.2 ACRE TREE REMOVAL, ACRES 63 CUBIC YARDS EARTH EXCAVATION 265 CUBIC YARDS CHANNEL EXCAVATION 204 TON AGGREGATE SURFACE COURSE, TYPE B 1 EACH REMOVAL OF EXISTING STRUCTURES 29.2 CUBIC YARDS CONCRETE STRUCTURES 2.8 CUBIC YARDS CONCRETE ENCASEMENT 1,296 SQUARE FOOT PRECAST PRESTRESSED CONCRETE DECK BEAM (27" DEPTH) 4,500 POUND REINFORCEMENT BARS 497 FOOT FURNISHING AND DRIVING STEEL PILES HP 12x53 1 EACH TEST PILE STEEL HP 12x53 1 EACH NAME PLATES 1 LUMP SUM MOBILIZATION 4 EACH TERMINAL MARKERS- DIRECT APPLIED 94 TON POROUS GRANULAR EMBANKMENT (SPECIAL) 112 FOOT STEEL RAILING, TYPE SM (SPECIAL) 0.1 ACRE SEEDING, CLASS 2 (SPECIAL) 188 TON STONE DUMPED RIPRAP, CLASS A4 (SPECIAL) 1 LUMP SUM TRAFFIC CONTROL & PROTECTION, (SPECIAL)