REMOVE GARAGE SLAB 1 LS; INSTALL 15" FLARED END SECTION 2 EA;REMOVE ELECTRICAL WIRING 1 LS; INSTALL 15" CMP CULVERT 40 LIN FT; SEAL EXISTING WATER WELL 1 LS; INSTALL WATER WELL 1 LS; REMOVE FLARED END SECTION 2 EA 3" CONCRETE VALLEY GUTTER 135 LIN FT; REMOVE 15" CMP CULVERT 50 LIN FT; L-867 HANDHOLE 4 EA; REMOVE BITUMINOUS PAVEMENT 200 SQ YD; NO. 8 WG, 5kV CABLE, INSTALLED IN DUCT BANK OR CONDUIT 870 LIN FT; COMMON EXCAVATION, P 450 CU YD; NO. 6 AWG, 600V CABLE, INSTALLED IN DUCT BANK OR CONDUIT 220 LIN FT; COMMON BORROW, OFF SITE 490 CU YD; NO. 10 AWG, 600V CABLE, INSTALLED IN DUCT BANK OR CONDUIT 650 LIN FT; SUBGRADE EXCAVATION 45 CU YD; SILT FENCE, TYPE MS 400 LIN FT; SELECT GRANULAR BORROW (CV) 1,400 CU YD SEED MIXTURE 25-131 0.3 ACRE; SUBGRADE PREPARATION 2,000 SQ YD FERTILIZER, TYPE 3 0.3 ACRE; AGGREGATE BASE (CV) CLASS 5 350 CU YD; HYDRAULIC MULCH MATRIX 0.3 ACRE; TYPE SP 12.5 WEARING COURSE MIX (2,B) 110 TON; PAVEMENT MARKINGS, YELLOW 107 LIN FT; TYPE SP 12.5 NON-WEARING COURSE MIX (2,B) 110 TON 80' X 90' HANGAR; COMPLETE DESIGN BUILD PER RFP 1 LS