The work includes but is not limited to: 1. Renovate existing interior spaces to accommodate: a. 14 classrooms on the 2nd floor b. 1 of 14 classrooms for Art c. 1 of 14 classrooms for high school science with sinks, gas, and ventilation hood d. 1 of 14 classrooms for high school science with sinks 2. Exterior: a. Installing a net and lines for an outdoor basketball area b. Providing indicators for accessible drop-off and pick-up c. Repair of existing storm water management system per Hadley Conservation Commission 3. Add Alternate renovations at the interior covered under the scope: a. 5 classrooms on the 1st floor b. Student Cafeteria on 1st floor c. kitchen with warming capabilities and commercial sink on 1st floor