1. 201.01 LS LS Clearing and Grubbing, including remove and dispose all downed tree, branches and debris in the stream $ $ 2. 209.01 LS LS Installation, Maintenance, Monitoring, Removal of BMP $ $ 3. 503.01 LS LS Reinforced Concrete for North abutment apron repair, including formwork, cofferdams, reinforcement, surface preparation, drilling and epoxy and installation $ $ 4. 503.02 LS LS Reinforced Concrete for South abutment Repair, including formwork, cofferdams, reinforcement, surface preparation, drilling and epoxy and installation $ $ 5. 503.03 18 CY Fill Void under existing GRP, abutments and wingwalls, including formwork, cofferdams, in place and complete. $ $ 6. 645.01 LS LS Traffic Control (furnishing, installing, maintaining and subsequently removing work zone traffic control devices and personnel) $ $ 7. 648.01 LS LS Field Posted Drawings $ $ 8. FA FA FA Additional work upon approval by the ADC. Unit price shall include cost to complete, coordinate, and supervise a subcontractor or third party for engineering service and repairs. Compensation shall be based upon work completed. $ 35,000 .00 $ 35,000 .00 9. 699.01 LS LS Mobilization (Not to exceed 6% of the sum of all items excluding bid price of this item and force account items) $ $