Clean and prep all surfaces to receive paint as per specifications and drawings. Prime and paint interior surfaces to match specifications. Existing popcorn & 2'x2' ceiling to be repaired as indicated on drawings a-802.00 & a-803.00. Contractor responsible for painting entire floor including hallways, doors, walls and ceilings. Apply new sealant around toilets between toilet & wall/floor. Apply sealant at vanity counter between vanity & wall. All existing HVAC diffusers & grilles to be cleaned. Contractor responsible for moving all furniture to the center of the room and protecting it prior to the start of work. Built-in counters, flooring, pendant lighting, etc. to be protected throughout the project. Contractor will be responsible for repositioning generally all furniture once the project is completed. No furniture is to be stacked or to be stored anywhere except inside the room. Contractor to patch & repair any damaged sheetrock prior to painting. FIT is responsible for the removal and replacement of 51 bathroom grilles as shown on drawings.