The scope of work for the renovation provides for, but is not limited to, various upgrades to the heating, cooling, ventilation, exhaust, and temperature control systems. Building F is currently served by 2 aging VAV air handling units and 66 parallel fan-powered VAV boxes with hot water reheat that shall be replaced. Chilled and hot water is provided from the campus plant. The building automation system is outdated and new actuators and valves, as well as new sensors for temperature and static pressure, shall be replaced. The terminal box replacement will require demolition of existing acoustical panel ceilings to provide access to hydronic and sheet metal connections at the boxes. The existing ductwork may need to be modified for changes in the terminal boxes and maintain static pressure and air flow. The ceiling replacement work also provides for replacing the lighting throughout the building, including lighting controls and adjustments to sprinkler devices as needed.