1. Notify Project Coordinator (PC) within 24 hours of plugging commencement. 2. Run sandline to check total depth (TD) approved by PC. 3. Trip in hole with work string. 4. Run 1sk gel followed by 200’ cement plug on bottom. 5. Run min 100’ cement plugs at casing seats, gas zones, perforations, and elevation. 6. Gel spacer between all plugs. 7. Elevation plug 1700’ – 1600’. 8. Cement plug across Big lime 1300’ – 1200’. 9. Set cement plug 1000’ – 900’. 10. Set cement plug 600’ – 500’. 11. Set cement plug at 400’ to 280’. Below coal. 12. Run Gamma Log and Caliper Log to coal seam. 13. Set open hole bridge plug at about 200’. Above coal. 14. Set cement plug 200’ to surface. 15. Tag all plugs to verify location. 16. Wait on cement plugs to firm before tag. 17. Set monument 10’ in ground and 3’ above ground.