This project is located at Harry Reid International Airport in the airfield immediately east of Taxiway "D." The work entails installation of 2,500 linear feet of reinforced concrete box (RCB) storm drain with associated manhole and drop inlet structures. This storm drain system will connect to future facilities in Gus Guiffre Drive. Miscellaneous underground utility work will be required to install the RCB storm drain including but not limited to an 18-inch diameter asbestos cement pipe (ACP) airport water main re-routing and lowering, power meter and fuse cabinet relocations, and airport sanitary sewer pipeline re-routing in Kitty Hak Way. The work also entails reconstruction of airport Gate 37 with a new crash rated gate and guard shack. A parking lot located on the northeast corner of GUS Guiffre Drive and Paradise Road will be re-graded and re-paved with asphalt. Various roadway curb and gutter improvements are also proposed at the intersection with Rental Car Road and Gus Guiffre Drive. An existing airport detention basin located east of Taxiway "D" will be filled in and abandoned.