The Enfield Team Section Headquarters is a 6-building complex established in 1978. The scope of work provides for the construction of an approximately 4,608 square foot storage building. The work will include extension of all utilities, insulated standing seam roof, heat, overhead and man doors and concrete floors/apron. The Anna Team Section Headquarters is an 11-building complex established in 1955. The scope of work provides for the construction of an approximately 1,600 square foot wash bay facility. The work will include extension of all utilities, oil water separator, power wash system, insulated standing seam roof, heat, overhead doors and concrete floors/apron. The Cold Storage Building (IDOT564-001) is a 4,950 square foot building established in 2017. The scope of work provides for the construction of an interior partition wall with personnel door, insulation and heat to the facility. The Carbondale Headquarters complex is a 11-building complex established in 1941. The District 9 Headquarters Office Building (D0900) is a 48,775 square foot building established in 1941. The scope of work provides for the repair or replacement of windows, spandrel panels and opening mechanism; and repair of any deterioration of opening as necessary. The Materials Lab (D0903) is a 25,440 square foot building established in 1958. The scope of work provides for the repair or replacement of all windows and personnel doors.