The Carthage Team Section Headquarters is a 6-building complex established in 1959. The scope of work provides for construction of an approximately 7,560 square foot maintenance building with a vehicle maintenance bay, a wash bay and 4 storage bays. The building will include, but is not limited to, an insulated standing seam roof, heat, overhead and man doors, concrete floors/aprons, and extension of all utilities. The Riggston Team Section Sub Headquarters is a 6-building complex established in 1989. The scope of work provides for construction of a salt storage structure with 2,000-ton capacity. The building will include concrete floor/apron and the extension of all utilities. The Pittsfield Team Section Headquarters is a 4-building complex established in 1968. The scope of work provides for construction of an approximately 4,320 square foot equipment storage building with 3 bays and a wash bay. The building will include, but is not limited to, heat, pressure washer, oil/water separator, overhead and man doors, concrete floors/apron, and extension of all utilities. The Quincy Team Section Headquarters is a 9-building complex established in 1958. The scope of work provides for construction of an approximately 3,780 square foot storage building with 3 bays. The building will include, but is not limited to, insulated standing seam roof, overhead and man doors, concrete floors/apron, and extension of all utilities. This work may include, but is not limited to, architectural, structural, civil, plumbing, electrical, heating, ventilation, and data. The A/E will be responsible and must utilize or be a qualified environmental firm for preparing/submitting plans and reports in accordance with Section 669 of IDOT's Standard Specifications for Road and Bridge Construction. The A/E will also be responsible for monitoring all soil excavation, ensuring contractor compliance and measurement for payment in construction.