1. Site Erosion And Sediment Control a) Contractor is responsible for fulfilling terms of City of Peoria Erosion Control Permit and all applicable portions of the “Erosion, Sediment, and Stormwater Control Ordinance of the City of Peoria”. b) Install control devices as shown on erosion control plan. c) Install additional measures as needed to control erosion and sedimentation on the site. 2. Silt Fencing Installation a) Install silt fencing according to details in plans. The silt fence shall be entrenched to a minimum depth of 8”. b) The silt fence shall be installed on the contour, with the ends extending up-slope c) Install silt fencing before commencing site clearing work. 3. Ditch Check Installation a) Install ditch checks according to details in plans. b) Install ditch checks at locations shown on plans. c) Install additional ditch checks as needed to control erosion within drainage swales as site conditions and weather dictate. d) Install ditch checks immediately after swales are graded. 4. Erosion Control Blankets Installation a) Install erosion control blankets as needed to control erosion in drainage swales and at the direction of the Owner’s Representative. b) Anchor stakes shall be driven at a spacing of 2 feet on center. 5. Culvert And Inlet Protection Installation a) Install culvert protection at upstream entrances to all culverts. b) Install culvert protection to intercept waterborne silt and sediment and prevent it from entering culvert pipes. c) Install immediately after culvert installation.