For each Work Authorization, the Contractor shall provide labor, materials, equipment and incidentals necessary for the work. Projects may include, but are not limited to, providing and placing new asphalt paving and patching, asphalt overlays and overlay fabric, application of asphalt crack seal, seal coating, performing profile grinding, hauling and disposal of grinding spoils, removal of existing paving markings and striping, preparation of surface for new stripping and markings, various stripe painting, concrete and asphalt saw cutting and coring of nonACM/non-hazardous materials, installation of concrete wheel stops, repair and replacement of curbs, lift and level of concrete sidewalks, road water drainage upgrades, which may require permits, and other related work.