Project will include, but not limited to following (all information herein subject to change): The following shall be included: GC License required Site Plan will be provided to on the following link (Click here for the Site Plans). Existing conditions, Topography, Grading Plan, Utility Plan, Erosion Plans & details. Run Off Reduction will be required with a Bioretention Pond Grinder pump will be needed as sewer connection is quite a distance Main 6” water line will have to be extended from current location to site location. Building Layout and dimensions will be provided. Building will be a metal building with A frame roof Building will be conditioned with Daiken units. Building will be wrapped in brick. Plywood will cover the inside walls 12ft high Offices will be sheetrock Locker room layout and locker type & specs will be provided...