Any problems encountered with equipment or materials, or labor shall be corrected by the contractor at “NO” additional expense to the City of College Park. All resurfacing projects shall also be warranted for one (1) year after completion. Proposals for street resurfacing work for variousroadways throughout the City with the following specification: 1. For resurfacing, clean, tack each listed street with 1.5” thick layer of 9.5 mm Superpave topping material per each individual as identified street specification at a total lump sum cost. 2. For milling, mill 1.5’ inch existing pavement to restore proper grade and or transverse slope, for the 9.5 mm Superpave topping material with lime, per each individual as identified per street list specification at a total lump sum cost. 3. Estimate price to include, Decal lanes, Excel lanes, turning lanes, all intersections 50’ full width curb to curb, Speed Bumps shall be removed and replace back per individual street, all Turnout, and any additional City Parking Spaces, if applicable, as identified per street specification for the entire length of the project at a total lump sum cost. 4. All Existing/Non-Existing Striping to be Restripe with Thermo-plastic material, turn arrows, and stop bars, on each streets resurfacing project list, this should be included in the lump sum price. Linear lines shall be thermo-plastic material to be used for all turns arrows, center lines, stop bars, and crosswalks, Edge lines, words symbol, Bike lanes. 5. All warning and advance signs are to be in place within 24 hrs. in advance alerting motorist of and the Citizens of College Park that a street resurfacing activity will be taking place Begin and End Date at all times. Temporary reflective tape shall be used on each individual listed street. 6. Contractor shall have designated certify flagging personnel present on site at all time actively directing traffic. 7. Contractor must provide a 24 hours clean-up service when each project is completed