District 1 – Telluride • Painting the following roads X48(1.9 miles), 57P (2.4 miles), 63L (2.2 miles), T60 (2.3miles) D65 (.5 miles) K69 (.4 miles), Traffic Control o Paint stripe approximately 180,112’ 4” double yellow and 4” edge lines o White Stop Bars 240 sq. ft. o Placerville 4” 200’ double yellow and 4”1,200’ white single line (SPRING/FALL) o Ski Ranches (Fox Farm) stripe double yellow/white edge (976”) one stop bar 60 sq. ft. District 2 - Norwood • Painting the follo42wing county roads AA42/42ZN Traffic Control o Paint stripe approximately 19,693’ 4” double and 4” edge lines District 3 - Egnar • Painting the following county roads H1 (5.5 miles) Egnar Traffic Control (FALL 2025) o Paint stripe approximately 116,160’ 4” double yellow and 4” edge lines