Listed below are the necessary components needed for each location: City Hall Annex: 250 KW Natural Gas Generator with Power Command App Acumen Control ATS 600A Service Entrance Rated Install Generator Foundation and Electrical Electrical Material, Wire, Conduit Crane to Lift, Transport, and Place Generator Training 125 KW Natural Gas Generator with Power Command App Acumen Control ATS 600A Service Entrance Rated Install Generator Foundation Electrical Material, Wire, Conduit Install Electrical Crane to Life, Transport, and Place Generator Training Public Works Operations Center: 200 KW Natural Gas Generator with Power Command App Acumen Control ATS 800A Service Entrance Rated Install Generator Foundation Electrical Material, Wire, Conduit Install Electrical Crane to Life, Transport, and Place Generator Training Community Center: 200 KW Natural Gas Generator with Power Command App Acumen Control ATS 400A Install Generator Foundation Electrical Material, Wire, Conduit Install Electrical Crane to Lift, Transport, and Place Generator Training