Labor and material to complete required NFPA inspections (Including but not limited to NFPA 1402 & 1403) and maintenance of the OFA live burn facility with System 203 thermal lining system, and fire paver floors for the following broken down below. *Including a general inspection of building / system, that involves removal (and replacement) of tiles for engineering inspection. (Per NFPA) Once required NFPA inspection completed, overall general inspection for; replacement of missing or loose bolt holes, tightening anchors as required, replacement of missing or badly damaged joint packing mix, replacement of 400-500 missing or badly cracked fire pavers and replacement of approx. 25 – 50 thermal lining tiles. If additional work is required, advise of that requirement and submit a proposal to complete same. Original quantity Estimated quantity Tile Maintenance 5000 1500-1600 Replacement Tiles 25-50 Packed Joints 200 Inft 100 -150 Inft Temporary Heat 3-4 days Fire Brick 18000 500