Mobilization to the site; Coordination of all construction activities with the appropriate local and State authorities and utilities; Coordination of all work with the Town and any of the Town’s Representatives; Contractor must demonstrate preparedness, and arrive to the site with an adequate plan, and with the necessary equipment, labor, and materials in order to complete the work requested; Proposed work includes, but is not limited to all excavation, dewatering, grading, compacting, in-situ compaction testing, and handling of all materials necessary to complete the proposed work; Providing temporary and permanent pavement, including but not limited to temporary paving, preparing driveway aprons (keying), binder course, & top course; Maintaining all required access to the site; Contractor shall coordinate with, and notify Dig Safe prior to commencement of any work at the site; Providing and marinating sanitary accommodation for the use of his employees and the owner, as may be necessary to comply with the requirements and regulations of the local and state departments of health; Performing all field engineering associated with this work, including but not limited to: construction line and grade, including the establishment of a construction baseline if needed, and construction layout. The contractor is to maintain a set of redline drawings and update them regularly as work progresses. Such drawings shall be submitted to the Owner at the end of the project, and shall be readily available to the Owner upon request; Providing dust control and conducting other required site control measures; Protection of existing structures and utilities in and around the limits of work; Installation and maintenance of erosion controls as directed; Loaming & Hydro seeding of disturbed areas; Maintenance and repair of all work for a period of one (1) year following the issuance of the Final Payment. This also includes repair of erosion for one (1) year after issuance of Final Payment. Grading, shaping, cleaning up, and restoration of all disturbed areas; On-site compaction testing of all materials, including pavement subbase and pavement; Adjustment of any structures, including frames and rims/covers as necessary; Demobilization from the site, including but not limited to removal of equipment and trailers and final cleanup of the site and immediate area.