Milling/Overlaying and Concrete Rehabilitation of approximately 2.2 miles of existing pavement on SR 25 from B.O.M (BOP STA 28+53) to Rankin County Line (EOP STA 108+18) along with the adjacent frontage roads. Details of specific work are mentioned in the following sections. NHPP-0056-01(114) / 109228301 SR 25 STA 28+53 (BOP) to STA 108+18 (EOP) (EQUATION) 48+10.69 BK to 9+94.3 AH (EQUATION) 87+88.13 BK to 88+04.74 AH Work in this section shall consist of milling 1½” and variable on the mainline and shoulders, and inlaying with 1½” of 9.5-mm, MT asphalt on the mainline and shoulders. Additional work includes full depth repairs of CRCP and drainage repairs. See attached tables for additional details. All guardrail not meeting current MDOT standards shall be replaced. Traffic will be allowed to run on the milled surfaces no more than five (5) consecutive days...