Work of the Project includes Building and Site Work for the construction of a new 349,848 sf Henry Clay High School designed for 2300 students. This high school will be constructed of masonry veneer on ICF, CMU and CIP concrete walls with areas of metal wall siding and canopy systems. This multi-story facility will be supported by caissons, grade beams, and spread footing with slab on grade. Roofing systems will be a 2-ply modified bitumen roof, with select areas of roof sanding seam metal panel. An ICC 500 compliant tornado shelter will be provided. This will be a high-performance building with geothermal heating and cooling and enhanced building envelope commissioning. Site work will encompass extensive earthwork, permeable surfaces, retaining walls, signage, utility work, landscaping, seeding and sodding, parking, drives and traffic control devices, and irrigated baseball and softball fields and equipment.