5.2.1 Provide a map showing location of Mitigation Bank submitted. The map must include boundaries of the 8-digit catalogue unit, the County, and site GPS coordinates. 5.2.2 Provide the Executed Mitigation Banking Instrument (MBI) and comparable DWR document for each Bank submitted, if applicable, (including the US Army Corps of Engineers (USACE) action ID (stream and/or wetland) and Division of Water Resources (DWR) project # (riparian buffer or nutrient offset). If the MBI or comparable DWR document has not been executed, include the prospectus or mitigation plan and any regulatory response. 5.2.3 Provide the credit release schedule(s) associated with Executed MBI and approved DWR document, if applicable. 5.2.4 Provide the Current Bank Ledger(s) showing all past transactions. 5.2.5 Provide the Estimated Credit Release Schedule through the contract period for mitigation credit type submitted.