The engineering consultant will be required to visit the City of Norman to become familiar with the proposed improvements, their scope of work, and the area affected. The scope of work is expected to include the following activities: 1. All improvements are to remain within the existing right-of-way and/or temporary construction easements. 2. Perform a topographic survey locating all adjacent property lines, fences, trees, utilities (above and underground), and other pertinent physical features on the south side of West Boyd Street within the Imhoff Creek floodplain. 3. Conduct any geotechnical surveys necessary to obtain all relevant soil information needed for the design of any piles, abutments, and foundations, as required for the new pedestrian bridge over Imhoff Creek. 4. Conduct any surveys necessary to design sidewalks along the south side of West Boyd Street from South Berry Road to South Flood Avenue to include removal and replacement of existing driveways. 5. Determine which driveways will need removal and replacement beyond the property line and obtain Temporary Construction Easements from each affected property.