Mobilization 1 LS Dollars Cents 2 Temporary Erosion Control 1 LS Dollars Cents 3 QA/QC Testing 1 ALLOW Five-Thousand Dollars Zero Cents $5,000.00 $5,000.00 4 Temporary Construction Access Installation, Maintenance, and Removal 1 LS Dollars Cents 5 Common Excavation 865 CY Dollars Cents 6 Beach Sand Excavation 450 CY Dollars Cents 7 Pavement Removal 1300 SY Dollars Cents 8 Sawcut Pavement 150 LF Dollars Cents 9 Common Borrow 2,200 CY Dollars Cents 10 MDOT Type A Base Gravel 150 SY Dollars Cents 11 MDOT Type D Subbase Gravel 670 SY Dollars Cents 12 Base 19.0mm Bituminous Pavement (2.5 inches thick) 1,300 SY Dollars Cents 13 Surface 9.0mm Bituminous Pavement (1.5 inches thick) 1,300 SY Dollars Cents 14 Geotextile 5,750 SY Dollars Cents 36-inch diameter Coir Log 2,080 LF Dollars Cents 16 4-5 ton Rock (Stone) 1,500 TON Dollars Cents 17 Cast-in-place Concrete Curbing 520 LF Dollars Cents 18 6” PVC, Perforated Underdrain Pipe 525 LF Dollars Cents 19 ¾ “ Crushed Stone Underdrain Pipe Bedding (check with MDOT specs) 85 CY Dollars Cents 20 15-inch HDPE Stormdrain Pipe 25 LF Dollars Cents 21 4-Foot Diameter Catch Basin 2 EA Dollars Cents 22 4-Foot Diameter Drain Manhole 2 EA Dollars Cents 23 RipRap Stone (D50=16”) 520 CY Dollars Cents 24 Paved Driveway Aprons (9.0mm surface pavement) 100 SY Dollars Cents 25 Coir Mat 1,050 SY Dollars Cents 26 Existing Guardrail removal and disposal 550 LF Dollars Cents 27 Guardrail installation 550 LF Dollars Cents Plantings 1,700 EA Dollars Cents 29 Mulch 1,050 SY Dollars Cents 30 Loam & Seed 1,050 SY Dollars Cents 31 Pavement Markings 2,000 LF Dollars Cents 32 Traffic Control 1 LS Dollars Cents 33 Rock Removal (Existing Revetment Stone) 1,200 TON Dollars Cents 34 Rock Removal (Bedrock/Ledge) TBD CY Dollars Cents 35 Unsuitable Soil Removal & Disposal TBD CY Dollars Cents