The following is a preliminary scope of work that may be modified during contract negotiations with the selected Contractor/Firm/Team. Anticipated Criteria 1. The contractor shall utilize the Preliminary Design Plan to the best of their ability, however, may need to supplement this design package with additional drawings and or engineered plans to complete the project in a manner that complies with NC Building Codes & Standards. This may require preparation of architectural, structural, mechanical, plumbing, fire protection, or electrical design and schematic plans for CCS Staff review and approval. 2. Site Development plans may include: a. Design Criteria: To be determined during site visit. b. System Design: confirm design intent, preliminary selection of building systems and materials, utility load review, code compliance, security plan expectations, and outline specifications to integrate systems, products, and procedures for architectural and civil. mechanical, or structural, if needed. 3. Work in digital format: AutoCAD or Building Information Modeling (BIM) software (or other approved software alternatives). 4. Develop preliminary estimate of installation cost setting forth in detail prior to commencing installation: quantities of materials, labor, profit, overhead, insurance etc. for the project. 5. Attend CCS meetings to coordinate and resolve value engineering, constructability, construction phasing and scheduling issues in the preliminary design. 6. Develop Installation Proposal detailing contract sum, estimated trade costs, proposed date of substantial completion and list of key vendors and/or suppliers. 7. Conduct periodic progress meetings, as requested by CCS. 8. Attend Board of Education meetings as requested by CCS. 9. Update the progress schedule periodically; as needed. 11. Present documents and drawings to required departments/agencies for technical review/approval for construction; Contractor shall be responsible for any Federal, State, and Local permit applications and approvals...