87. GENERAL A. Provide all labor, materials, and equipment required to complete the scope of work as shown on the drawings, and as further described below. B. Specific items identified below are intended as a reference for scope only. Subcontractor is responsible for providing all items for their work and related work shown on the drawings, as specified, or needed to make this scope of work complete. C. Inclusion of all reference keynotes and general notes shown on drawings, as applicable to this trade. 88. Abatement of Asbestos Containing materials A. Include all containments and testing to meet state requirements. B. Include the proper disposal of all asbestos containing materials listed in the appendices section of the project manual (Hazardous Material Report provided by Sage Environmental, Dated October 26th, 2021) C. Do not include the razing of the existing structure at 11 William St. D. Include rodent control and vibration monitoring. E. Include provisions for dust control. F. Do not include the management of cutting and capping all utilities. G. Do not Include the demolition of the existing building’s foundation. H. Include protection of existing to remain pavers, structures, and powerlines. I. Do not include the demolition of the existing parking lot. J. Do not include the demolition of existing utilities. K. Do not include site clearing. L. Include a proposed unit rate schedule should more ACM be encountered Hourly rate for labor 9”x9” VFT and Mastic - SF Ductwork - LF Air Cell Pipe Insulation including mudded elbows - LF Caulking along aluminum exterior overhang – LF Asphalt roofing materials including field and flashing. - SF