1 PREPARATION OF PROJECT LIMITS/DEMOLITION PLAN Clearing demolition pavement removal, grubbing, miscellaneous structure removal including all appurtenances, removal and delivery of salvage material, fine grading, including compaction, all necessary additional fills and cuts, hauling and spreading of select material to the limits indicated in the plans all complete in place per lump sum (LS) for 2 8" COMPACTED SALVAGE BASE (Salvaged Asphalt/Flexible Base Material) Compacted as per plans and specifications, complete and in place per square yard (SY) for (Response required) Quantity: 590 UOM: SQUARE YARD 3 REINFORCED CONCRETE DRIVEWAY IMPROVEMENTS 6" thick, 3,000 psi concrete, joints and joint sealer, with rebar and dowels 24" on center, grading, all as per the plans and specifications for the width shown, all complete in place per square foot (SF) for (Response required) Quantity: 5300 UOM: SQUARE FOOT 4 THERMOPLASTIC PAVEMENT STRIPING/MARKINGS AND SIGNAGE (Crosswalk) As indicated in the plans and specifications, all complete and in place per lump sum (LS) for (Response required) Quantity: 1 UOM: LUMP SUM TRAFFIC CONTROL PLAN In accordance with the latest TMUTCD.