The work consists generally of the removal & disposal of existing A.C. pavement as needed for removal of existing valves, abandonment-in-place and capping of piping, placing new water piping, and restoring residential services and existing fire hydrants to service. New water valves and complete piping assemblies with related fittings are to be installed. Trenches and excavated areas are to be backfilled and native material or new A.C. Pavement/Base are to be placed as called for in the plans and specifications around water valve cans. Water valve cans are to be adjusted to grade. Existing utilities are to be protected in place. Traffic control and safety measures, as needed, are required, including steel plates to cover trenches in street intersections where needed. Written or verbal notification is to be provided to all who may be affected by water outage and road closures.