Specifications include, but are not limited to: Project Scope of Work: Remedial action comprised of the following major work scope elements: Removal and disposal of pavement, and improvements necessary to remove contamination from the open leaking underground storage tank (LUST) release, including removal of the existing parking lot, concrete aprons with concrete curbing. Removal of abandoned underground storage tank (UST) systems including tanks, piping, fill ports, dispenser island, etc. Removal and proper disposal of contaminated soils, up to, but not beneath roadway and not within right-of-way utility corridors. Removal and proper disposal of contaminated groundwater, if encountered, from the excavation. Collection of verification soil samples. Verification soil samples will be taken discretely. Backfilling and compacting the excavation with certified clean fill to existing grade, covered with topsoil from an approved source, and seeding with grass or other material as determined in consultation with EGLE and the property owner.