Observation and evaluation of the roof, structural systems, and other damaged areas to identify areas in need of initial public safety measures and to develop repair alternatives to prevent further damage and deterioration. Task 1 – Project Kick-Off and Site Evaluation: • Initiate the project with a kick-off meeting to establish project objectives, scope and expectations. • Prepare and send scope of services to at least three contractors to assist in the building evaluation, including making access into the building areas safe. Tasks will include removing hanging debris, creating access and pathways through debris for lift access. Building debris will remain on-site and not removed and disposed of as part of this task. Entrances will be secured at the end of the evaluation to help prevent trespassing. Contractor shall provide lift and operator for the duration of the evaluation. • Conduct site visits as needed to observe current existing conditions. • Conduct a structural assessment of roof framing, including measurements of existing typical framing and framing near damaged roof areas.