A. The following services are required of the architect and/or engineer: • The selected firm shall provide the necessary drawings and specifications to address: 1. The replacement of the following existing air handling units (AHUs) Unit ID Area Served Remarks AHU-1 Boys Locker Rooms Heating and Ventilation AHU-2 Team Locker Room Heating and Ventilation AHU-4 Pool Heating, Vent and Dehumidification AHU-5 Pool Lobby Heating and Ventilation AHU-6 Locker Room Heating and Ventilation 2. The necessary modifications to the ductwork and mechanical piping 3. The necessary controls and control sequences to integrate new air handling units with existing controls on school campus 4. The implementation heat recovery and other control strategy to optimize operations 5. Pricing from a professional estimating agency to implement the project broken down by labor and material costs per task. • The selected firm shall provide all associated drawings, specifications and bid package documentation required of the contractor to perform the corrective work. • Note that the project will be subject to Prevailing Wage Rates. B. Attached are exhibits, as part of this RFP, which are provided to help identify units as the labeling in the field and on BMS may be different, • Exhibit 3- BMS Graphics identifying the units • Exhibit 4- Available pictures of the equipment. C. The following systems are to be incorporated into the AHU upgrades and design based on a prior review with the district: • Air handling unit design • Pool area dehumidification • AHU Power and Control System • Control Accessories