A. The following services are required of the architect and/or engineer: • The selected firm shall provide the necessary drawings and specifications to address 1. the replacement of the following existing air handling units (AHUs) Unit ID Area Served Remarks HV-1, 2, 3, & 4 Field House (Area B) Include cooling capability AC2_1, 2, 3 & 4 Gymnasium (Area D) Include cooling capability AC2_5, & 6 Locker Rooms (Area D) AC2_7, & 8 Fitness Center (Area D) Include cooling capability 2. The necessary modifications to the ductwork and mechanical piping, including proper air stratification addressed in the Gym and Field House air distribution design 3. Design to include cooling capability for Field House, Gymnasium and Fitness Center 4. Evaluate and include upgrades necessary to space building enclosure necessary to accommodate cooling 5. The necessary controls and control sequences to integrate new air handling units with existing controls on school campus. 6. Pricing from a professional estimating agency to implement the project broken down by labor and material costs per task. • The selected firm shall provide all associated drawings, specifications and bid package documentation required of the contractor to perform the work. • Note that the project will be subject to Prevailing Wage Rates. B. Attached are exhibits, as part of this RFP, which are provided to help identify units as unit labeling in the field and on BMS may be different, • Exhibit 3- BMS Graphics identifying the units • Exhibit 4 – Mechanical schedule C. The following systems are to be incorporated into the AHU upgrades and design based on a prior review with the district: • Air handling unit design including cooling for Field House, Gymnasium and Fitness Center. • Updates to enclosure necessary for space cooling • AHU Power and Control System • Control Accessories