Bid Package #2 - SMFCSD Bid - Meadow Heights Elementary School and George Hall Elementary School As per specified locations and construction specifications provided by the District, the project consists of all labor, materials, equipment and services necessary to complete the following scope: ● Move all furniture in and out of rooms during pre/post construction, provide wall protection ● Abatement of areas as required (See report - Scope description) ● Demo and remove the existing carpet, VCT/LVT, Linoleum and wall base ● Furnish and Install specified moisture barrier system and provide proper floor preparation for all existing concrete subfloor areas receiving new flooring as per manufacturer specifications ● Fill all subfloor cracks with specified filler as per manufacturer specifications ● Furnish and Install new specified entry walk off carpet tile, resilient plank flooring, resilient sheet flooring, top set coved wall base and all related sundries and accessories.