Quarterly preventative maintenance (PM) agreement includes inspections of the following systems: A. Model 533LS Sterilizer (21"); B. GTS30AMOP3203 Generator; C. Reverse Osmosis (RO) Water System; D. Calibration checks using the PACS 3000 control system; Details: 1. The technician must be trained on all the system components listed above. 2. The technician will inform the customer of any replacement parts that are needed. If the required parts are available in the customer's inventory, the technician will install them. For parts not in the customer's inventory, the technician will obtain customer approval to order them for installation during the next scheduled inspection. 3. All labor for equipment inspection, adjustment, lubrication, installation of replacement parts, and testing during scheduled preventive maintenance (PM) inspections will be included in the offer price. 4. All labor for repair calls between PM inspections that arise from equipment failure will also be included. 5. The Hawaii Department of Agriculture and the awarded company may extend this agreement for an additional twelve (12) months at the exact cost, provided both parties agree to the extension.