• A Traffic Control Plan is to be provided by the Contractor and reviewed and approved by the BSB Public Works Road Division before site mobilization. • Surface preparation and cleaning. • The pavement design location should be centered between the existing crosswalk bars. • Prime the pavement marking areas with 2-part primer. • Payment Pattern Specification o Install TrafficPatterns, by Ennis-Flint, pavement markings in accordance with industry standards, local regulations and the approved design. o Adhere the thermoplastic with the Ennis-Flint SR-120 heater for proper adhesion and add additional Corundum during the heating process to ensure good skid resistance. • Quality assurance and quality control measures. • Project documentation and reporting.