: THE SCOPE OF WORK INCLUDED IN THIS PERMIT ENCOMPASSES THE REPLACEMENT OF A 1200A ATS AND A GENERATOR DAILY TANK CONTROLLER PANEL. THE NEW DESIGN AIMS TO REPLACE THE EXISTING ATS AND TANK CONTROLLER WITH NEW ONES OF LIKE SIZE AND TYPE AT THE SAME LOCATION. THE EXISTING ATS, WHICH FEEDS CRITICAL LOADS FOR THE MUSEUM AND RESEARCH LAB, IS BEING REPLACED DUE TO PERSISTENT FAILURE ISSUES. ALL EXISTING ASSOCIATED FEEDERS, CONDUITS FOR THE ATS WILL BE RETAINED AND REUSED. THERE ARE NO ARCHITECTURAL, MECHANICAL, PLUMBING OR LIGHTING SCOPE. NOTE: BUILDING IS AN OCCUPIED 24/7 RESEARCH FACILITY. THE BUILDING SYSTEMS MUST REMAIN FUNCTIONAL AT ALL TIMES. ALL NEW ELECTRICAL WORK SHALL COMPLY WITH UNIVERSITY OF BERKELEY ELECTRICAL SAFETY PROGRAM THAT WAS UPDATE ACCORDING TO THE NFPA 70E 2018-2021.