North Powder/Richland/Halfway Curb Ramps Project on Various Highways in North Powder, Richland, & Halfway. FAP No. SA00(805). ($ 5,000,000 - $ 10,000,000). Req. approx. 2,635 ft2 temp. signs; 3 ea. PCMS; 3,840 hr flaggers; 1,540 ft ped. chan. dev.; 5 ea. decom. reg. UST; 4 ea. decom. heating oil tanks; 1,278 ton contam. soil disp.; 2,000 gal. contam. groundwater rem.; seg. & stockpile contam. soil; const. surv. work; 6,369 yd2 rem. of surf. for curb ramp const.; 5,927 ft asph. pvmt. sawcutting; 218 ft storm sewer pipe; 140 ft. DI pipe; 3 ea. conc. MH; 39 ea. conc. inlets; 26 ea. adj. boxes; 37 ea. conn. to extg. str.; 16 ea. adj. inlets; 5 ea. adj. MH; 3,077 ton aggr. base; 692 ton ACP; 4,807 ft. conc. curb; 425 ft2 conc. drvwy.; 33,075 ft2 conc. walks; 148 ea. curb ramps; 1,794 ft2 trunc. domes; 1,978 ft paint pvmt. mark.; 1,693 ft2 pvmt. bar; 3.4 yd3 sign supp. ftg.; 1,720 lb PSST sign supp.; 591 ft2 signs; pole foundations; refurb. & reinstall extg. illumin. syst.; 12 yd3 rock mulch; rem. & rebuild fence; 2 ea. hydrant extensions. Completion Time: September 30, 2026. Classes of Work: Either: A) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances. THIS PROJECT CONTAINS FUEL ESCALATION CLAUSE. THIS PROJECT CONTAINS A 5% DBE GOAL. THIS PROJECT CONTAINS A 10% INDIAN EMPLOYMENT PREFERENCE GOAL.