Haul Debris to Landfill: Remove, temporarily store on site, and legally dispose of all debris resulting from construction activities. Interior shall be vacuumed clean, yard raked and free of glass, nails and lead suspect paint chips. Vinyl Bow Window: Remove and dispose of entire window unit. Field measure and install a medium grade PVC, Bow window Wrap exterior trim with aluminum coil stock and caulk. Prep and paint interior trim as needed with owners choice interior latex paint. Clean Glass. Flooring-LVF: Remove trim and existing flooring, field measure and install Quiet walk insulation and Vinyl plank flooring with a material allowance of $3.50 per sf. use matching transitions in each doorway. Reinstall trim, caulk or fill nail holes.