1. Erosion and Sediment Control BMPs and Environmental Pollution Control. 1 LS LS $ 2. 12” Dia. Reinforced Concrete Pipe 200 LF 3. Drain Manhole, complete 1 EA 4. Adjustment of Existing Utility Structures 3 EA 5. Clean Existing Drain Structures, including 5-feet of connecting piping 1 EA 6. Asphalt Concrete Pavement, City Mix No. 4 140 TON 7. Aggregate Base Course 6 CY 8. Asphalt Treated Base 9 CY 9. 2” min. Cold Planing 1 LS LS 10. Pavement Markers, Striping, and Marking 1 LS LS 11. Traffic Separation Curb 1 LS LS 12. 8” Thick Concrete Wall with Strut Beams 105 LF 13. Bioretention Area 1 LS LS 14. Bioretention Area - 4” Thick Mulch Layer 5 CY 15. Bioretention Area - Plantings 1 LS LS 16. 18” Thick Engineered Soil Media 21 CY 17. 6” Thick Engineered Storage 16 CY 18. 6” thick Grouted Rubble Paving (GRP) 1 LS LS 19. Irrigation System 1 LS LS 20. Geotextile Fabric 1 LS LS 21. Bioretention Area Landscape Maintenance 12 MONTHS 22. 3B Fine Crushed Rock 46 CY 23. Concrete Thru Gutter 130 LF 24. Reinforced Concrete Jacket 37 LF 25. Reinforced/Non-Reinforced Curb and/or Gutter Reconstruction 26. Mobilization (Not to Exceed 6% of the Total Sum of All Items, Excluding the Bid Price of this Item, Force Account and Allowance Items). The cost for demobilization shall be considered appurtenant to the mobilization cost. 1 LS LS 27. Traffic Control 1 LS LS 28. Traffic Control – Regulatory and Warning Signs, Reflectorized Delineators and Route Markers Assemblies 1 LS LS 29. Construction Monitoring 1 LS LS 30. Construction Surveys 1 LS LS 31. As-Built Drawings 1 LS LS