a. Limits of work as per plans, stockpiling, staging and entrance shall be determined in the field. b. Furnish, install, and maintain six-foot height panelized/mobile temporary constructions metal fence and hardware as required to protect and secure the limits of work and staging area. c. Restore any pavement areas disturbed or damaged by the work. d. Remove and dispose of existing Poured-in-Place safety surfacing within limits of playground. e. Remove and dispose of existing playground equipment in Areas A, including associated appurtenances and concrete footing complete as needed to accommodate new playground equipment. f. Existing concrete curb around Area A to remain in place; will serve as bounds of new PIP surfacing and playground. g. Existing PIP was installed to meet the minimum standard for Shock Attenuation of ASTM F1292, estimated existing total thickness of PIP is 3.5 to 4.0 inches. Remove and dispose offsite any dynamic or existing gravel subbase as required for new finished work and profile of new PIP safety surfacing and compact subgrade. h. Furnish and install new playground equipment. i. Refinish existing bollards (20 units) with new paint to match color scheme of playground equipment. j. Existing Playground equipment in Area A basis of design shall be by Kompan Inc.,or approved equal. Remove and replace all existing structures within Area A with new equipment and associated installation hardware. Refer to Article 42 for list of equipment. k. Furnish and install poured in place (PIP) rubber safety surfacing to limits of existing curb boundary/border. Coordinate grades to be flush with adjacent surfaces and flush and accessible at existing access/entrances. l. The Work shall be substantially completed for use and occupancy by: i. August 22, 2025