1) Accessibility and drainage improvements to the parking lot identified in the site plan, attached as Exhibit 1. 2) Tenant improvement based on the Level 1 and Level 2 “Preferred Design Option” floor plans attached as Exhibit 2, flooring replacement throughout the building, LED upgrade to interior and exterior lighting, and rooftop mechanical unit replacement at the basement mechanical room. Complete programming documents will be provided to the successful proposer. 3) Recommended seismic upgrades in the Structural Evaluation Report, attached as Exhibit 3. The complete report with analysis will be provided to the successful proposer. 4) Building envelope condition assessment, recommendations, and design documents for repairs. 5) Roofing removal and replacement. Architect to include roofing replacement documents provided by County into construction, bidding and permitting documents. 6) Construction cost estimates during the design phase.