Building Enclosure Commissioning: Design Phase a. Create a preliminary commissioning plan to encompass the Design, Construction, Acceptance and Warranty/Operations Phases. b. Create and maintain a master issues log and a separate record of outstanding deficiencies throughout the entire commissioning process. Issues shall be categorized by phase of the project. Comments during the design phase shall be recorded in the master issues log for response by the A/E. Report all issues as they occur directly to the Owner’s Project Manager and provide a copy to the Construction Manager (CM) and Design Team. c. Create and maintain a master progress summary to track overall progress throughout the entire project. It shall include an entry for each piece of system component cross-referenced with required tasks by the CxA team. d. Perform final design review, drawings and specifications at following stages of development: late Design Development and late Construction Documents 95%, complete. Provide comments to the Owner and Design Team for recommendations on improving details related to the exterior envelope.