1. Scope of work is to remove approximately 180 sq feet of existing ceiling sheetrock to expose building structure for work to be done by others. Once the work is completed by others the ceiling will need sheetrock installed and finished as listed below. Please be advised that this will be a multi-step process. a. Prepare the Work Site: i. Protect the Entire Floor: Use plastic sheeting or drop cloths to cover the entire floor area to protect it from debris, dust, and paint. ii. Clear the Area: Remove any obstacles, furniture, or items that could interfere with the work. iii. Ensure Safety: Make sure the site is safe by securing any potential hazards. This includes covering electrical outlets and securing any exposed wiring. b. Remove Existing Drywall: i. Take Down Old Drywall: Carefully remove the existing drywall on both sides of the area, cutting it away from studs and removing fasteners like nails or screws. ii. Clean the Studs: After removing the drywall, inspect the studs for any damage, mold, or issues that need fixing. c. Install New Drywall: i. Measure and Cut Drywall Sheets: Measure the dimensions of the walls and cut the drywall sheets to fit the space. ii. Hang the Drywall: Attach the new drywall sheets to the studs using drywall screws or nails. Be sure the sheets are level and aligned correctly. iii. Check for Gaps: Ensure that there are no large gaps between the drywall sheets, and that the edges meet cleanly...