A-1 Mobilization and General Conditions Lump Sum 1 $ $ A-2 Furnish, install and maintain Erosion and Sediment Control Measures Lump Sum 1 $ $ A-3 Drill pilot hole to 900 feet, obtain formation samples, perform sieve analysis and prepare pilot hole for geophysical logging by the Engineer Lump Sum 1 $ $ A-4 Construct new Leonardtown Well No. 6 including well casing and screen installation, well development, 24- hour pumping test and water quality sampling, as specified Lump Sum 1 $ $ A-5 Furnish and install 1,100 gpm @ 500’ TDH submersible pump; 1800 RPM standard construction, as specified Lump Sum 1 $ $ A-6 Furnish and install 200 HP, 1800 RPM submersible motor; standard construction, as specified Lump Sum 1 $ $ A-7 Furnish and install 400 feet of 8-inch steel T&C pump column & submersible pump cable, as specified Lump Sum 1 $ $