The work to be performed under this contract is generally described as, but not necessarily limited to the provision of all necessary materials and labor to fully complete: the construction of Stanford Crossing road extension from its current end point near the existing City water tank site up to Dos Reis Road totaling approximately 1,500 linear feet in length and 100 linear feet of road widening on Dos Reis Road with a pavement section of 3.5” of Hot-Mix-Asphalt (HMA) over 4” of Class 2 Aggregate Base (AB) on 10” Lime Flyash (LFA) Subgrade; installing sanitary sewer, storm drain, and water system utilities; constructing frontage improvements including curb, gutter, sidewalk, streetlights, and landscape; installing signing and striping improvements; and performing all appurtenant work in place and ready for use, all as shown in the Contract Plans and Specifications.