• Working with professional design team during the design stages. CMAR will be tasked to review plans at 30%, 60%, 90% and 100% to ensure constructability, adequacy of materials and pricing, preparation of project schedules, conducting feasibility analyses, assisting with site plans and/or design alternative and recommendations, and preliminary cost estimates leading to a Guaranteed Maximum Price (GMP). CMAR shall help identify any design restrictions that could affect the overall design and intent of the project. • Preparation of a detailed cost estimate at the 30%, 60% and 90% design phase intervals to confirm initial budget allocations and/or to seek City’s advice before proceeding with next level and final designs phases. The CMAR will be responsible for cost controls throughout the design and construction project except for design and construction elements added or deleted by an expressed City directive.