City Project 2025-109 Central Village Street Improvements 2,600 LF Remove and Replace Curb and Gutter 14,400 SF Remove Concrete Walk and Valley Gutter 4,700 SY Remove Bituminous Pavement 20,500 SY Mill Bituminous Pavement (2.0”) 4 EA Storm Sewer Structure 5 EA Casting Assembly 25 EA Adjust Frame & Ring Casting 3,670 TN Bituminous Mixture 770 SY Concrete Pavement 5,000 SF Concrete Walk 2,700 SF Color/Stamped Concrete Walk 2,800 SF Concrete Pedestrian Ramp 3,250 SF Concrete Driveway and Valley Gutter 750 SF Modular Block Retaining Wall 400 LF Chain Link Fence 10,000 LF Pavement Marking 0.40 AC Seeding 1 EA Pergola Structure with Footings 3 EA Benches 2 EA Bike Racks 6 EA Trees 165 EA Shrubs and Perennials With related items.