The Rio Vista Corporation Yard Phase 2 is a design-build project in Rio Vista, CA. The project design is 75% complete and will require the Contractor to finalize site plans, specifications, and quantity estimates. The Contractor will also be responsible for electrical calculations, geotechnical borings and reports, structural calculations, and permit submissions to Solano County Building Department, City of Rio Vista Fire, Water, and Wastewater Departments. The Project construction involves the demolition of an existing metal building, fabrication and construction of a prefabricated metal building, foundation work, utility work, and grading. HAZMAT reports are required. If asbestos and lead are found, the Contractor will be required to obtain a Bay Air Quality Management permit and dispose of the material to a certified landfill. The Rio Vista Project Site 75% Construction Plans and CAD files are provided as reference material only. It should be assumed that the Bid Item Schedule and Plans will be amended and modified as the design process progresses. The Department of Information Technology (DOIT) Benicia Shelter Project in Benicia, CA includes site preparation, utility work, grading, placement of a pre-purchased 85,000 lbs equipment shelter, and remove of the existing modular building and foundation for information technology facilities. Solano County will provide for the delivery of the modular building to the project site. The Contractor will coordinate the delivery of the modular building with the Engineer. The DOIT Benicia Shelter project design is complete, and no design services are required for this project.