A.UPS Installation - Must install all function of new APC UPS System. - Must install Power strips for network racks - Must meet State of Michigan Electric codes. - Clean up to remove any old or replace equipment. Optional 1: Subpanel If it determines that building will need a sub panel installed on site. The subpanel must be installed with current system with little downtime. Pricing for the subpanel must be label under optional - Labor and materials must be listed, and everything must be labeled in the panel according to Central Dispatch Director labeling. B. INSTALLATERS 1. Prospective bidders, vendors, and contractors will be required to work with Chippewa County Information System, Central Dispatch, & UPS Vender. a. Installer must work with Central Dispatch 911 venders to insure all system our restored after cut over 2. All workers must have CJIS secure training & Fingerprint Cert Must be provided to Chippewa County 10 day before visit. 3. Everything must be installed side by side with the current system. 4. Downtime/ cut over time must be kept to a minimum. (Max of 3 to 4 hours) 5. Cut over must happen between 3 am to 8 am. The Cut over will happen on a Tuesday morning. (Final date must be finalize by County Emergency Manager) 6. Install must happen between September 1, 2025, and September 30, 2025. (Final date must be finalize by County Emergency Manager) 7. All work must be completed between 8 and 3:30pm am and troubleshoot an issue caused by that day work between 3:30 pm and 4 pm. Worker must return system to same level of service before leaving. (no additional cost will be incurred for repairing something company broke) *(work hours) 8. Completion date can be pushed back if the county must delay work for (unforeseen issue) 9. All power cables must be labels for each rack 10. UPS Installed must meet manufacturer warranty requirements and must past warranty inspection