I. Site Restoration: a. The completion of the site restoration work shall include, but is not limited to the restoration of all areas disturbed by the construction work operations such as: i. backfilling, all final lawn rough grading, finish fine grading of the lawn surfaces as specified in the preparation to install the hydro-seeding materials for lawn areas, the actual hydro-seeding and fertilization of the prepared ii. approved turf lawn areas, protection of all fixed site improvements like fencing, trees, play structures, walk and other paved surfaces from any over-spray, clean-up following installation work, aeration, and fertilizing, and other maintenance and care necessary to produce a quality lawn including scarifying and re-application of any bare areas as required until the new turf is fully established. iii. Confirm approval by City Representative and final clean-up of the park to turn back over to the City, and all other items necessary to complete the job, whether specifically mentioned or implied. If the City Representative determines that topsoil from this site or other project sites is acceptable topsoil the contractor may be allowed to reuse the acceptable topsoil as backfill material for site restoration. II. Mobilization: a. Mobilization will be paid for on a contract lump sum basis. Price paid shall be payment in full for all labor, material, and equipment necessary for all preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, tools and any other incidentals that are required to project site; and any other facilities necessary to undertake the work on the project; and for other work and operations, which must be performed, or for expenses incurred, prior to beginning work on the various contract items at the project sites. This item shall also include preconstruction costs, exclusive of bidding costs, which are necessary direct costs to the project and are of a general nature rather than directly attributable to other pay items under the contract. The price paid shall be paid in full for Mobilization throughout the progress of the project work until completed. III. Layout & Field Survey: a. Layout and field survey will be contractor’s responsibility. Price shall be contractor’s responsibility to lay out all site elements, mark all field locations, set grades and review with City Representative for approval. IV. Bonds & Insurance: a. Contractor shall secure bonding and insurance required for this project, per General Conditions. Bonds and insurance shall be maintained for the duration of the project until closeout, final acceptance, and final payment.